Other
Dos Lagos Heart
Recreation & Sports Facilities
Corona, CA
Dos Lagos Heart
Corona, CA
Dos Lagos Heart
Corona, CA
- Construction of a 10-acre site that was designed to be the central feature to the live-work-play community
- A four-acre butterfly shaped man made lake, that has a central nine foot waterfall, was constructed
- An undulated walkway, covered with a 750x16 garden trellis of bamboo, concrete and steel, runs between the two lake halves
- The 534-acre development includes office space, live-work lofts, an 18-hole Championship Golf Course, 135 acres of wetlands, shops, movie theatres, restaurants, business and resort hotels, 3 residential communities and the Lake District
- This project received Project of the Year award for 2007
Project Detail
Gateway to Temecula
Other
Temecula, CA
Gateway to Temecula
Temecula, CA
Gateway to Temecula
Temecula, CA
Gateway to Temecula is a retail shopping center which not only serves as a beautiful entry point into Temecula, but also as a gathering place for Temecula residents and visitors for shopping, dining, and working. CCSI constructed four main buildings of this 61,000-square-foot shopping center. Building A holds a two-story Extra Mile convenience store with offices upstairs. This one-of-a-kind gas station shop includes a car wash, wine cellar, and a boutique Chronic Tacos restaurant. Building B includes two retail stores that were developed into the Pizza Press and a Verizon Wireless store. Building C was developed into a Starbucks with a spacious outdoor patio and drive-through. And finally building D, with a total square-footage of 8,000 was developed into a two-story building, with spaces for two stores on the first floor, and office spaces on the second floor.
Project Detail
Architect: Walter R. Allen & Associates; Frederick Designs
Chapman University
Other
Orange, CA
Chapman University
Orange, CA
Chapman University
Orange, CA
- Renovation of two, two-story, historical buildings that were originally constructed in 1911 and have significant historical value to the University
- Scheduling was a high priority for the project; project start did not begin until school session was over and had to be completed before class resumed
- 50 tons of hazardous waste were disposed at the end of the project
- With these being older structures, a few unexpected issues did arise; added manpower and weekend work accelerated the schedule to ensure timely completion
Project Detail
Irvine Fire Station 20
Other
Irvine, CA
Irvine Fire Station 20
Irvine, CA
Irvine Fire Station 20
Irvine, CA
The 12,500-square-foot station includes, 9 dwelling units, a day room, exercise room, kitchen, instrument room, training room, two captain's offices, and a three-door apparatus bay.
Project Detail
Architect: LPA, Inc.
Features: Includes a HAZ-MAT facility, one of two of the OCFA, and one of three in the county.
Fountain Valley Square Remodel
Other
Fountain Valley
Fountain Valley Square Remodel
Fountain Valley
Fountain Valley Square Remodel
Fountain Valley
Demo of existing site improvements of a 7.5-acre shopping center including underground improvements, paving, and concrete. New construction consisted of complete site improvements and ground-up construction of a new 18,000-square-foot grocery store shell building, facade, and structural remodel of two additional existing retail buildings totaling 43,000 square feet.
Project Detail
Features: Work included grading and preparation of two future building pads.
Marriott Burbank Airport Hotel & Convention Center
Other
Burbank, California
Marriott Burbank Airport Hotel & Convention Center
Burbank, California
Marriott Burbank Airport Hotel & Convention Center
Burbank, California
- 56,000 square feet of renovations including demolition and replacement of existing hotel entrance
- Landscape improvements, which included the relocating of 26 120” boxed trees, as well as installation of a 90 foot water feature at the entry island
- Construction on this project was complete
Project Detail
CVS-Peoria
Other
Peoria, AZ
CVS-Peoria
Peoria, AZ
CVS-Peoria
Peoria, AZ
Ground-up, 14,800-square-foot building located in Peoria, Arizona with drive-through pharmacy window and a tiled canopy constructed above. Work also included interior tenant improvement and site work.
Project Detail
Designer: Jacobs
Features: Drive-through pharmacy.
Sun Diego Boardshop
Other
San Clemente, CA
Sun Diego Boardshop
San Clemente, CA
Sun Diego Boardshop
San Clemente, CA
This project was an interior buildout of a 6,000-square-foot retail store with 15 different areas for specialty vendors to display their product lines. Additional work included installing a video wall which shows the vendors’ brands and products. The store is located in the newly constructed San Clemente Outlets. One of the challenges for this job was getting final approval before the mall was completed, as construction was delayed several months.
Project Detail
Designer: Baker Architecture
Features: The store has polish concrete floors, track lighting for product display.
Bonjour Bagels Cafe
Other
Buena Park, CA
Bonjour Bagels Cafe
Buena Park, CA
Bonjour Bagels Cafe
Buena Park, CA
Build out of an open space into a gourmet deli and bagel shop. Project also includes a fully functional kitchen, walk in freezer, large boiler and oven, deli display cases, food preparation area and an espresso bar.
Project Detail
Features: Extensive millwork, marble flooring, trendy tables/ seating areas, spot lighting with low voltage to enhance atmosphere which was requested from the client.
Union Bank Hermosa Beach Plaza Hermosa Shopping Center
Other
Hermosa Beach, CA
Union Bank Hermosa Beach Plaza Hermosa Shopping Center
Hermosa Beach, CA
Union Bank Hermosa Beach Plaza Hermosa Shopping Center
Hermosa Beach, CA
Ground-Up construction of new bank branch. Scope of work includes; glass partitions with a watermark design, custom light features and light cherry wood finishes. Art Deco design throughout the bank, with slate blue and gold tiling. Large interior bank vault, two drive-up tellers and two drive-up ATM’s.
Project Detail
Features: Parking lot includes drainage filter for environmental protection with permeable asphalt system.
Supercuts Various Shopping Centers
Other
Multiple Locations throughout California
Supercuts Various Shopping Centers
Multiple Locations throughout California
Supercuts Various Shopping Centers
Multiple Locations throughout California
CCSI performed both new construction and tenant improvements for more than 20 Supercuts stores throughout Southern California. The projects ranged between 1,400 and 2,800 square feet (per store). Work included extensive lighting distribution, raised platform, product display, shampoo area and a central vacuum system.
Project Detail
Partial List of Locations:
Union Bank of California
Other
San Diego, CA
Union Bank of California
San Diego, CA
Union Bank of California
San Diego, CA
New interior partitions, doors, storefronts and ceilings. Custom millwork and finishes throughout the office. New mechanical, electrical and plumbing. Structural work and redesign for interior as well as parking lot. Site location, ongoing traffic and occupied businesses around bank caused for a four-phase project in order not to disrupt ongoing business.
Project Detail
Declan Suites
Other
San Diego, CA
Declan Suites
San Diego, CA
Declan Suites
San Diego, CA
Remodeled two mock suites for downtown San Diego high-rise hotel. Work included stripping the rooms all the way down to the studs and rebuilding. Installed dry wall, reconfigured bathrooms, installed all new fixtures, lighting, flooring, hvac and built-ins. This project required coordination with hotel operations. Construction occurred while open for business and without distrupting hotel patrons.
Project Detail
The Village
Recreation & Sports Facilities
San Diego, CA
The Village
San Diego, CA
The Village
San Diego, CA
This project was a multi-faceted, high-end renovation of The Village Apartments property (formerly La Mirage). Work was completed on time within various phases over the period of one year. It included full renovation of a 13,000 square-foot clubhouse, which included a commercial kitchen, retrofit of an elevator, construction of an all new fitness center, a new pool house, installation of one new swimming pool, renovating two additional swimming pools and three saunas. New hardscape and landscape was installed throughout the property.
Project Detail
Architect: MVE & Partners, Burton Landscape Architecture Studio
Features: The new clubhouse was built with a horseshoe-shaped bar with pendant lighting, one-inch-thick resin bar top, custom quartz tops, banquet seating, extensive AV, 22 television monitors, Wi-Fi for residents, and a game room. The fitness center includes custom tile work and custom finishes throughout. Landscape included 18 imported date palms, and a new concrete paver pool deck was installed.
Irvine Fire Station #38
Other
Irvine, CA
Irvine Fire Station #38
Irvine, CA
Irvine Fire Station #38
Irvine, CA
- Construction of a single-story fire station, which included grading, framing, installation of utilities, drywall, installation of floor covering, concrete work, paving, roofing, landscaping
- Eight dorm rooms, common restroom and shower facility, fully loaded gym, recreational room and garage with two truck bays.
Project Detail
Olinda Ranch Historical House / Ranger Station
Other
Brea, CA
Olinda Ranch Historical House / Ranger Station
Brea, CA
Olinda Ranch Historical House / Ranger Station
Brea, CA
- Restoration of three historical buildings at Olinda Ranch, to appear as they may have been in the 1920’s when originally built as a station for oil workers in the area
- Roofing was repaired, new doors and windows installed, and fresh paint helped bring the buildings back to life
- The interior wood structural frame had to be repaired and reinforced, and matching tin was found to complete the outside
- Along with the renovation, new HVAC was installed, as the buildings are open to the public as a museum.
- Entire renovation was completed in less than 90 days
Project Detail
Canyon View Creekside
Other
Whittier, CA
Canyon View Creekside
Whittier, CA
Canyon View Creekside
Whittier, CA
Rose Hills Canyon View Creekside included moving and relocating more than 180,000 yards of terrain on an eight-acre site. The entire area was compacted and filled in the disposal site to a new rough grade design. A SWPPP was put in place after grading operations for both cut and fill site.
Project Detail
Architect: Clark & Green Associates
Features: The project’s design consisted of two retaining walls, which also required temporary relocation of 112,000 yards of earth. Additionally, excavation of eight more feet was requested by the owner for future use. Even with the added work, this job was completed in 70 days and within the scheduled deadline.
Mission Hills Phase 3A & B
Other
Whittier, CA
Mission Hills Phase 3A & B
Whittier, CA
Mission Hills Phase 3A & B
Whittier, CA
This project included mass grading with over excavation and rock removal of subsurface for burial inventory. The scope of work included the development of a new street and associated utilities ,concrete work, and decorative concrete and tile work. This project was built in two seperate and succesive phases to meet the client’s grand opening date. Elements of civil work were perfromed at night in order to not interfere with the public.
Project Detail
Features: Decorative colored concrete flatwork with center feature fountain, retaining wall with stone veneer and urn niche were incorporated into wall with tile mosaic feature. Elements of precast stone were installed at both the center feature fountain and niche wall, as well as decorative wrought iron railings, lawns and additional landscaping.
Irvine Ranch Historic Red Barn
Other
Irvine, CA
Irvine Ranch Historic Red Barn
Irvine, CA
Irvine Ranch Historic Red Barn
Irvine, CA
- The Orange County Harbors, Beaches & Parks Department initiated the relocation and renovation of the historic red barn that originated at the Irvine Ranch during the days of James Irvine II. The barn was built in 1910 at the Irvine ranch headquarters
- To begin the restoration, American Heavy Moving & Rigging, Inc. transported the barn about ¼ miles to its new location near the site of the original Irvine ranch house
- Then Consolidated Contracting Services, Inc. began construction work, building a structural foundation and temporary framing system to support the barn while it remained suspended 3 feet above the foundation
- Once the foundation cured, American Heavy Moving & Rigging, Inc. lowered the barn. Consolidated Contracting then constructed the interior structural frame, later attaching the frame to the building before removing the temporary bracing system
- All construction was completed in 100 days before the barn was restored aesthetically. The barn is now open as a museum featuring turn-of-the-century farming equipment
Project Detail
Ladera Ranch Fire Station # 58
Other
Ladera Ranch, CA
Ladera Ranch Fire Station # 58
Ladera Ranch, CA