• Dos Lagos Heart Lake View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Dos Lagos Heart Hallway View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Dos Lagos Heart Lake and Building View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Dos Lagos Heart Lake View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Dos Lagos Heart Hallway View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Dos Lagos Heart Lake and Building View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

DOS LAGOS HEART

CORONA, CA

  • Construction of a 10-acre site that was designed to be the central feature of the live-work-play community
  • A four-acre butterfly-shaped man-made lake that has a central nine-foot waterfall was constructed.
  •  An undulated walkway, covered with a 750x16 garden trellis of bamboo, concrete, and steel, runs between the two lake halves.
  •  The 534-acre development includes office space, live-work lofts, an 18-hole Championship Golf Course, 135 acres of wetlands, shops, movie theatres, restaurants, business and resort hotels, three residential communities, and the Lake District.
  • This project received the Project of the Year award for 2007

PROJECT DETAIL


  • Gateway to Temecula Outside View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Gateway to Temecula Outdoor Tables — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Gasoline Station — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Gateway to Temecula Outside View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Gateway to Temecula Outdoor Tables — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Gasoline Station — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

GATEWAY TO TEMECULA

TEMECULA, CA

Gateway to Temecula is a retail shopping center that serves as a beautiful entry point into Temecula and as a gathering place for Temecula residents and visitors for shopping, dining, and working. CCSI constructed four main buildings of this 61,000-square-foot shopping center. Building A holds a two-story Extra Mile convenience store with offices upstairs. This one-of-a-kind gas station shop includes a car wash, a wine cellar, and a boutique Chronic Tacos restaurant. Building B includes two retail stores that were developed into the Pizza Press and a Verizon Wireless store. Building C was developed into a Starbucks with a spacious outdoor patio and drive-through. And finally, building D, with a total square footage of 8,000, was developed into a two-story building, with spaces for two stores on the first floor and office spaces on the second floor.

PROJECT DETAIL

ARCHITECT: Walter R. Allen & Associates; Frederick Designs


  • Chapman University — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Chapman University Signage — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Chapman University Building — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Chapman University — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Chapman University Signage — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Chapman University Building — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

CHAPMAN UNIVERSITY

ORANGE, CA

  • Renovation of two two-story historical buildings that were originally constructed in 1911 and had significant historical value to the University
  • Scheduling was a high priority for the project; the project began when the school session was over and had to be completed before class resumed.
  • 50 tons of hazardous waste were disposed of at the end of the project
  • With these being older structures, a few unexpected issues did arise; added manpower and weekend work accelerated the schedule to ensure the timely completion.

PROJECT DETAIL


  • Irvine Fire Station 20 — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station 20 with Fire Trucks — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station 20 Office — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station 20 — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station 20 with Fire Trucks — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station 20 Office — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

IRVINE FIRE STATION 20

IRVINE, CA

The 12,500-square-foot station includes nine dwelling units, a day room, an exercise room, a kitchen, an instrument room, a training room, two captain's offices, and a three-door apparatus bay.

PROJECT DETAIL

ARCHITECT: LPA, Inc.

FEATURES: Includes a HAZ-MAT facility, one of two of the OCFA, and one of three in the county.


  • Fountain Valley Square Remodel Outdoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Fountain Valley Square Remodel Parking — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Fountain Valley Square Remodel Far View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Fountain Valley Square Remodel Outdoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Fountain Valley Square Remodel Parking — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Fountain Valley Square Remodel Far View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

FOUNTAIN VALLEY SQUARE REMODEL

FOUNTAIN VALLEY

Demo of existing site improvements of a 7.5-acre shopping center, including underground improvements, paving, and concrete. New construction consisted of complete site improvements and ground-up construction of a new 18,000-square-foot grocery store shell building, facade, and structural remodeling of two additional retail buildings totaling 43,000 square feet.

PROJECT DETAIL

FEATURES: Work included grading and preparation of two future building pads.


  • Marriott Burbank Airport Hotel — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Marriott Burbank Airport Hotel Front — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Marriott Burbank Airport Hotel Entrance — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Marriott Burbank Airport Hotel — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Marriott Burbank Airport Hotel Front — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Marriott Burbank Airport Hotel Entrance — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

MARRIOTT BURBANK AIRPORT HOTEL & CONVENTION CENTER

BURBANK, CALIFORNIA

  • 56,000 square feet of renovations, including demolition and replacement of the existing hotel entrance
  • Landscape improvements, which included the relocating of 26 120" boxed trees, as well as the installation of a 90-foot water feature at the entry island
  • Construction on this project was complete.

PROJECT DETAIL


  • CVS-Peoria Side View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • CVS-Peoria Parmacy — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • CVS-Peoria Parmacy Side View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • CVS-Peoria Side View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • CVS-Peoria Parmacy — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • CVS-Peoria Parmacy Side View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

CVS-PEORIA

PEORIA, AZ

Ground-up, 14,800-square-foot building located in Peoria, Arizona, with a drive-through pharmacy window and a tiled canopy constructed above. Work also included interior tenant improvement and site work.

PROJECT DETAIL

DESIGNER: Jacobs

FEATURES: Drive-through pharmacy.


  • Sun Diego Boardshop Indoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Sun Diego Boardshop Clothings — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Sun Diego Boardshop Outdoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Sun Diego Boardshop Indoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Sun Diego Boardshop Clothings — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Sun Diego Boardshop Outdoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

SUN DIEGO BOARDSHOP

SAN CLEMENTE, CA

This project was an interior build-out of a 6,000-square-foot retail store with 15 different areas for specialty vendors to display their product lines. Additional work included installing a video wall that shows the vendors' brands and products. The store is located in the newly constructed San Clemente Outlets. One of the challenges for this job was getting final approval before the mall was completed, as construction was delayed several months.

PROJECT DETAIL

DESIGNER: Baker Architecture

FEATURES: The store has polished concrete floors and track lighting for product display.


  • Bonjour Bagels Cafe — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Bonjour Bagels Cafe — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

BONJOUR BAGELS CAFE

BUENA PARK, CA

Build out of an open space into a gourmet deli and bagel shop. The project also includes a fully functional kitchen, walk-in freezer, large boiler and oven, deli display cases, food preparation area, and an espresso bar.

PROJECT DETAIL

FEATURES: Extensive millwork, marble flooring, trendy tables/ seating areas, and spotlighting with low voltage to enhance the atmosphere, which the client requested.


  • Union Bank Hermosa Beach Plaza — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Union Bank Hermosa Beach Plaza Lobby — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Union Bank Hermosa Beach Plaza Customer Care — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Union Bank Hermosa Beach Plaza — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Union Bank Hermosa Beach Plaza Lobby — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Union Bank Hermosa Beach Plaza Customer Care — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

UNION BANK HERMOSA BEACH PLAZA HERMOSA SHOPPING CENTER

HERMOSA BEACH, CA

Ground-Up construction of new bank branch. The scope of work includes; glass partitions with a watermark design, custom light features, and light cherry wood finishes. Art Deco design throughout the bank, with slate blue and gold tiling. Large interior bank vault, two drive-up tellers, and two drive-up ATMs.

PROJECT DETAIL

FEATURES: The parking lot includes a drainage filter for environmental protection with a permeable asphalt system.


  • Supercuts Various Shopping Centers — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Supercuts Various Shopping Centers Waiting Area — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Supercuts Various Shopping Centers Office — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Supercuts Various Shopping Centers — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Supercuts Various Shopping Centers Waiting Area — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Supercuts Various Shopping Centers Office — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

SUPERCUTS VARIOUS SHOPPING CENTERS

MULTIPLE LOCATIONS THROUGHOUT CALIFORNIA

CCSI performed new construction and tenant improvements for more than 20 Supercuts stores throughout Southern California. The projects ranged between 1,400 and 2,800 square feet (per store). Work included extensive lighting distribution, raised platform, a product display, a shampoo area, and a central vacuum system.

PROJECT DETAIL

PARTIAL LIST OF LOCATIONS:

Anaheim Hills - Crossroads Shopping Center

Anaheim - Anaheim Plaza

Bellflower - Cerritos Promenade

Buena Park - Heritage Square Shopping Center

Fullerton - La Mancha Shopping Center

Lakewood - Lakewood Center

Orangethorpe - Fullerton Marketplace

Placentia - Placentia Square

Santa Ana - Bristol Place Shopping Center

Tustin - The Market Place

Encinitas - El Camino Square

Jamacha - Rancho San Diego Towne Center

Oceanside - Quarry Creek Plaza

Beverly Hills - Beverly Palm Plaza

Burbank - Cornell Plaza

Palm Desert - Desert Gateway Shopping Center

Huntington Beach - Newland Center

La Habra - La Habra Westridge Plaza


UNION BANK OF CALIFORNIA

SAN DIEGO, CA

New interior partitions, doors, storefronts, and ceilings. Custom millwork and finishes throughout the office. New mechanical, electrical, and plumbing. Structural work and redesign for the interior as well as the parking lot. Site location, ongoing traffic, and occupied businesses around the bank caused a four-phase project in order not to disrupt ongoing business.

PROJECT DETAIL


  • Declan Suites Room — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Declan Suites Unit — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Declan Suites Bathroom — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Declan Suites Room — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Declan Suites Unit — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Declan Suites Bathroom — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

DECLAN SUITES

SAN DIEGO, CA

Remodeled two mock suites for a downtown San Diego high-rise hotel. Work included stripping the rooms down to the studs and rebuilding. Installed drywall, reconfigured bathrooms, and installed all new fixtures, lighting, flooring, HVAC, and built-ins. This project required coordination with hotel operations. Construction occurred while open for business and without disrupting hotel patrons.

PROJECT DETAIL


  • The Village Outdoor Rest Area — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • The Village Outdoor Top View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • The Village with Big Pools — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • The Village Outdoor Rest Area — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • The Village Outdoor Top View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • The Village with Big Pools — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

THE VILLAGE

SAN DIEGO, CA

This project was a multi-faceted, high-end renovation of The Village Apartments property (formerly La Mirage). Work was completed on time within various phases over one year. It included a complete renovation of a 13,000 square-foot clubhouse, which included a commercial kitchen, an elevator retrofit, an all-new fitness center, a new pool house, installation of one new swimming pool, renovation of two additional swimming pools, and three saunas. New hardscape and landscape were installed throughout the property.

PROJECT DETAIL

ARCHITECT: MVE & Partners, Burton Landscape Architecture Studio

FEATURES: The new clubhouse was built with a horseshoe-shaped bar with pendant lighting, a one-inch-thick resin bar top, custom quartz tops, banquet seating, extensive AV, 22 television monitors, Wi-Fi for residents, and a game room. The fitness center includes custom tile work and custom finishes throughout. The landscape included 18 imported date palms, and a new concrete paver pool deck was installed.


  • Irvine Fire Station #38 — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station #38 Backyard — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station #38 Front — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station #38 — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station #38 Backyard — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Irvine Fire Station #38 Front — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

IRVINE FIRE STATION #38

IRVINE, CA

  • Construction of a single-story fire station, which included grading, framing, installation of utilities, drywall, installation of floor covering, concrete work, paving, roofing, landscaping
  • Eight dorm rooms, common restroom, shower facility, fully loaded gym, recreational room, and garage with two truck bays.

PROJECT DETAIL


  • Olinda Ranch Historical House — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Olinda Ranch Historical House Sign — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Olinda Ranch Historical House Outdoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Olinda Ranch Historical House — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Olinda Ranch Historical House Sign — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Olinda Ranch Historical House Outdoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

OLINDA RANCH HISTORICAL HOUSE / RANGER STATION

BREA, CA

  • Restoration of three historical buildings at Olinda Ranch to appear as they may have been in the 1920s when originally built as a station for oil workers in the area
  • Roofing was repaired, new doors and windows were installed, and fresh paint helped bring the buildings back to life.
  • The interior wood structural frame had to be repaired and reinforced, and a matching tin was found to complete the outside.
  • Along with the renovation, new HVAC was installed, as the buildings are open to the public as a museum.
  • The entire renovation was completed in less than 90 days.

PROJECT DETAIL


  • Canyon View Creekside with Tractor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Canyon View Creekside Field View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Canyon View Creekside Hills and Field View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Canyon View Creekside with Tractor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Canyon View Creekside Field View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Canyon View Creekside Hills and Field View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

CANYON VIEW CREEKSIDE

WHITTIER, CA

Rose Hills Canyon View Creekside included moving and relocating more than 180,000 yards of terrain on an eight-acre site. The entire area was compacted and filled in the disposal site to a new rough-grade design. An SWPPP was put in place after grading operations for both the cut and fill site.

PROJECT DETAIL

ARCHITECT: Clark & Green Associates

FEATURES: The project's design consisted of two retaining walls, which also required the temporary relocation of 112,000 yards of earth. Additionally, the excavation of eight more feet was requested by the owner for future use. Even with the added work, this job was completed within 70 days and within the deadline.


  • Mission Hills Wall Paint — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Hills High Stairs — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Hills Fountains — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Hills Wall Paint — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Hills High Stairs — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Hills Fountains — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

MISSION HILLS PHASE 3A & B

WHITTIER, CA

This project included mass grading with over-excavation and rock removal of the subsurface for burial inventory. The scope of work included the development of a new street and associated utilities, concrete work, and decorative concrete and tile work. This project was built in two separate and successive phases to meet the client's grand opening date. Civil work elements were performed at night to not interfere with the public.

PROJECT DETAIL

FEATURES: Decorative colored concrete flatwork with a central feature fountain, retaining wall with stone veneer, and urn niche were incorporated into the wall with a tile mosaic feature. Precast stone elements were installed at both the center feature fountain and niche wall, as well as decorative wrought iron railings, lawns, and additional landscaping.


  • Irvine Ranch Historical Red Barn — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

IRVINE RANCH HISTORICAL RED BARN

IRVINE, CA

  • The Orange County Harbors, Beaches & Parks Department initiated the relocation and renovation of the historic red barn that originated at the Irvine Ranch during the days of James Irvine II. The barn was built in 1910 at the Irvine ranch headquarters
  • To begin the restoration, American Heavy Moving & Rigging, Inc. transported the barn about ¼ miles to its new location near the site of the original Irvine ranch house.
  • Then Consolidated Contracting Services, Inc. began construction work, building a structural foundation and temporary framing system to support the barn while it remained suspended 3 feet above the foundation.
  • Once the foundation cured, American Heavy Moving & Rigging, Inc. lowered the barn. Consolidated Contracting then constructed the interior structural frame, later attaching the frame to the building before removing the temporary bracing system.
  • All construction was completed in 100 days before the barn was restored aesthetically. The barn is now open as a museum featuring turn-of-the-century farming equipment.

PROJECT DETAIL


  • Fire Trucks — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Ladera Ranch Fire Station #58 — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Ladera Ranch Fire Station #58 Front — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Fire Trucks — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Ladera Ranch Fire Station #58 — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Ladera Ranch Fire Station #58 Front — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

LADERA RANCH FIRE STATION # 58

LADERA RANCH, CA

  • Ground-Up construction of a two-story residence and fire station combination building with a kitchen
  • The truck bays house multiple engines, medical trucks, and urban rescue semi-trailers that are packed and ready at all times for disaster.
  • Installation included a vehicle exhaust containment system, an emergency generator, and a fueling station for vehicles.
  • Extensive alarm system for the receipt and dispatch of emergency calls

PROJECT DETAIL

Call us at 949-498-7500 for more information about our construction projects.

Share by: