• Office Pantry with Lot of Tables — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Office Training Rooms — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Office Lobby with Elevator — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Office Pantry with Lot of Tables — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Office Training Rooms — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Office Lobby with Elevator — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

METRO C&O FACILITY

SAN DIEGO, CA

Ground-Up construction of a two-story, 30,000 square-foot masonry building, including structural steel framing, block, glass window structures, and new parking lot. The project included  meeting rooms, office space, storage areas, conference rooms, copy center, kitchen, balconies with covered canopies and two concrete stairways. An elevated bridge was also constructed to connect the building's 2nd floor to an elevated parking lot.

PROJECT DETAIL

ARHITECT:

Richard Yen &

Associates


FEATURES: Equipped with full generator back-up capabilities, automatic transfer switch, Sola Tube lighting and GRAFIK Eye 400 automatic dimming systems.

LEED Gold Certified Building.


  • Corporate Training and Service Center Outdoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Corporate Training and Service Center Outside View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Corporate Training and Service Center Far View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Corporate Training and Service Center Outdoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Corporate Training and Service Center Outside View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Corporate Training and Service Center Far View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

CORPORATE TRAINING AND SERVICE CENTER

WILDOMAR, CA

This job included the construction of three concrete tilt-up buildings; an administrative building, a warehouse, and a garage. Work also included a truck repair area and wash rack, five overhead steel canopies that house parking spaces and storage areas, rooftops with photovoltaic panels, and 17 acres of site improvements.

PROJECT DETAIL

ARHITECT: Richard Yen & Associates


FEATURES: Decorative landscaping with an artistic cable structure at the entrance.

LEED Platinum Certified.


  • Cott Beverages Indoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Cott Beverages Indoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Cott Beverages Water Bottles — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Cott Beverages Indoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Cott Beverages Indoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Cott Beverages Water Bottles — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

COTT BEVERAGES

SAN BERNARDINO, CA

Project was an overall construction of the California facility, including the tilt-up building, plumbing, electrical, concrete and preparation of the building for the new machinery. Consolidated Contracting quickly adjusted to dramatic changes to the scope of the work that quadrupled the contract value. Extremely tight working conditions and fast track schedule necessitated several temporary workarounds to test the water line while materials and equipment were built and delivered.

3000-gallon holding tank pumped out disposed water to sewer while underground pump station tank and specialized pumps were installed

Building preparation for the installation of the new machinery included plumbing, electrical, and concrete.

PROJECT DETAIL

ARCHITECT: The Stahlman Group/Sidel Industries


FEATURES: The firm purchased a new machine line that will create plastic bottles through a blow mold process - approximately 800 bottles per minute. Once the bottles are created, the machine fills each bottle with reverse osmosis treated water.


  • Slide title

    Write your caption here
    Button
  • Hewlett Packard Building — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

HEWLETT PACKARD VARIOUS LOCATIONS

Complete renovation of 250,000 square-foot building. Installation of four new braced frames in each building segment along with associated foundations and collectors. Project also consisted of demolition of walls, ceiling grid, and saw-cut foundation. There was the removal and replacement of cable trays, fire sprinklers and lighting.

PROJECT DETAIL

FEATURES: The building was fully occupied throughout entire project and it consisted of five structurally independent segments.

CCSI performed new construction and tenant improvements for three-Hewlett-Packard locations throughout Southern California.


  • Murrieta Base Facility with Patio — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Murrieta Base Facility Outdoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Murrieta Base Facility Outdoor View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Murrieta Base Facility with Patio — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Murrieta Base Facility PWD Parking Lot — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

MURRIETA BASE FACILITY

MURRIETA, CA

Three single-story masonry block buildings were constructed: an administration building totaling 13,734 sqaure-feet; a Logistics and Training building totaling 4,003 square feet; and a Fleet Services/Fuel Dispensing Station building totaling 5,304 square-feet.

Energy-efficient and energy design features such as skylights, innovative wastewater technology systems, and water use reduction systems were put into place.

PROJECT DETAIL

ARCHITECT/DESIGNER: Richard Yen & Associates


FEATURES: Interior include showers & lockers, restrooms, conference rooms, a kitchen, and private offices. The Fleet Services building included the construction of multiple vehicle lifts and a vehicle service pit.

LEED Silver Certified

If you have an industrial project in mind, get started by calling us at 949-498-7500.

Share by: