• Everest Value Charter School — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Everest Value Charter School Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Everest Value Charter School Metal Table — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Everest Value Charter School — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Everest Value Charter School Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Everest Value Charter School Metal Table — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

EVEREST VALUE CHARTER SCHOOL

LOS ANGELES, CA

This is a two-story ground-up construction of a 24,539-square-foot tk-8th grade school. This project consists of 19 classrooms, support spaces, utility rooms, multi-purpose rooms, boys and girls lockers, elevator, EV charge stations, playground, green screen panels, canopies and soccer field.

PROJECT DETAIL

DESIGNER: CSDA Design Group


  • Indoor Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Honeycomb Wood Storage — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Outdoor Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Indoor Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Honeycomb Wood Storage — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Outdoor Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

ENVIRONMENTAL NATURE CENTER PRESCHOOL

NEWPORT BEACH, CA

Ground-up construction of a 10,380-square-foot preschool. The preschool includes an admin building, a classroom building, a covered courtyard, and a nature-inspired play area.

PROJECT DETAIL

ARCHITECT: LPA Design Studios

FEATURES: LEED Platinum and Living Building Challenge 3 pedal certified, Photovoltaic system on the roof, design laser cut BOK panel fence, permeable paver parking lot, and car chargers in the parking lot.


  • Stella Middle Charter Academy Top View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Stella Middle Charter Academy Side View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Stella Middle Charter Academy Outdoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Stella Middle Charter Academy Top View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Stella Middle Charter Academy Side View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Stella Middle Charter Academy Outdoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

STELLA MIDDLE CHARTER ACADEMY

LOS ANGELES, CA

This 119,270-square-foot three-story, steel and wood-framed, ground-up construction project consists of a fully-sprinklered building that accommodates 21 classrooms for students grades five through eight and an administration area. Scope of work also included a 4,447-square-foot gymnasium built with CMU blocks that houses a basketball court and volleyball court for the students.

PROJECT DETAIL

ARCHITECT: Berliner Architects


  • Montessori Academy on the Ranch — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Montessori Academy on the Ranch Outdoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Montessori Academy on the Ranch Far View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Montessori Academy on the Ranch — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Montessori Academy on the Ranch Outdoor — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Montessori Academy on the Ranch Far View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

MONTESSORI ACADEMY ON THE RANCH

RANCHO MISSION VIEJO, CA

The 14,000-square-foot, 2-story building includes six primary classrooms, three toddler classrooms, three offices, a meeting room, a kitchen, and a prep-kitchen. Construction also included the parking lot, site utilities, outside play area, landscape, and irrigation. Click the video below to see more on the project!

PROJECT DETAIL

ARCHITECT: David Sheegog


  • Fountain of Life Lutheran Church — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Inside of Fountain of Life Lutheran Church — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Fountain of Life Lutheran Church Kitchen — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Fountain of Life Lutheran Church — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Inside of Fountain of Life Lutheran Church — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Fountain of Life Lutheran Church Kitchen — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

FOUNTAIN OF LIFE LUTHERAN CHURCH

LA MIRADA, CA

Remodeled 5,495 square feet of the existing church chapel, bathrooms, offices, patio, and landscape. We added an additional 1,800 square feet, which included new restaurant quality kitchen, storage areas, meeting room & exterior trellis and playground.

PROJECT DETAIL

ARCHITECT: J7 Architect

FEATURES: Restaurant grade appliances and playground.


  • Redeemer by the Sea Church & School — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Redeemer by the Sea Church & School Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Redeemer by the Sea Church & School Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Redeemer by the Sea Church & School — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Redeemer by the Sea Church & School Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Redeemer by the Sea Church & School Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

REDEEMER BY THE SEA CHURCH & SCHOOL

CARLSBAD, CALIFORNIA

  • Ground-Up construction of two new two-story buildings to accommodate the Church, Pre-school and Kindergarten.
  • Exterior balconies and bridges were built to access the second story of the buildings.
  • New courtyard and playground areas were constructed.
  • Creative scheduling was required to maintain campus functionality throughout the construction process.
  • Safety was our number one priority in protecting families and staff that were utilizing the buildings during construction.

PROJECT DETAIL


  • Mission Lutheran Church Front — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Lutheran Church Inside — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Lutheran Church Kitchen — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Lutheran Church Front — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Lutheran Church Inside — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Mission Lutheran Church Kitchen — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

MISSION LUTHERAN CHURCH

LAGUNA NIGUEL, CA

  • Demolition of existing buildings and construction of two new buildings that house; Mission Hall, kitchen, school offices, and church faculty offices/ specialty rooms.
  • Decorative stained-glass window was salvaged during demolition and now used as artwork in the buildings.
  • Project was finished on time and within budget.

PROJECT DETAIL


  • Computer Room — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Kitchen Room — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Faith Lutheran Church & School — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Computer Room — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Kitchen Room — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Faith Lutheran Church & School — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

FAITH LUTHERAN CHURCH & SCHOOL

VISTA, CA

  • Reconstruction of an existing 26,000 square foot, two-story building that provides the Church and School facilities with improved classrooms, cafeteria, gymnasium, library and administrative office.
  • Creative scheduling was required to maintain campus functionality while the church and school were occupied through the duration of the project.
  • Interim travel and access routes around the campus were developed to be used during the course of construction.

PROJECT DETAIL


  • Pond — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Rancho Santa Margarita United Methodist Church — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Rancho Santa Margarita United Methodist Church Near View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Pond — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Rancho Santa Margarita United Methodist Church — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Rancho Santa Margarita United Methodist Church Near View — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

RANCHO SANTA MARGARITA UNITED METHODIST CHURCH

RANCHO SANTA MARGARITA, CA

A large entry and a courtyard featuring a baptismal pool. Consolidated Contracting Services, Inc. managed the construction of two new two-story buildings that feature outdoor play area for kids and a social area for adults. A pedestrian bridge connects the buildings and allows access from the classroom and meeting center to the larger multipurpose room and computer center. The first building houses a Community Wellness Clinic, a large classroom, community meeting room and kitchen area. The second building houses career development and vocational skill-building classrooms, job training and youth centers. Work included landscaping, structural steel moment frame, very large footings, conventional wood framing, stucco finish, ceramic tile walkways, fire sprinkler lines, and underground utilities.

PROJECT DETAIL


  • Parking Lot — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Elementary Office — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Aerial View of School — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Parking Lot — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Elementary Office — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Aerial View of School — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

STONEYBROOKE CHRISTIAN SCHOOL

LADERA RANCH, CA

  • Construction of new school campus included site walls, parking lots, placement of 30 modular buildings, entry gates and other site amenities including 5 basketball courts and a soccer field.
  • Scope of work consisted of grading, landscape and irrigation, wet utilities, underground drainage, and traffic control improvements.
  • Tie-ins at existing roadway intersections required Consolidated Contracting to establish a detailed traffic control and trench safety plans for this project.

PROJECT DETAIL


  • Child Care Center — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Child Care Center Slides — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Child Care Center Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Child Care Center — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Child Care Center Slides — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Child Care Center Playground — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

CITY OF SAN DIEGO, CHILD CARE CENTER

SAN DIEGO, CA

  • Ground-Up construction of a Child Care Center for the City of San Diego, E-5 Occupancy with one-hour fire rated corridors and rooms.
  • Construction took place on the 24th floor of a high rise building with no parking and limited loading zones.
  • An 8,000 square foot upper deck playground and play structure was built, and a 12,000 square foot lower playground.
  • Center includes three children's sized bathrooms, seven classrooms, a kitchen, lounge, administrative offices, crib / changing stations and a laundry room.

PROJECT DETAIL


  • Red Hill Lutheran Church — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button
  • Red Hill Lutheran Church — San Clemente, CA — Consolidated Contracting

    Slide title

    Write your caption here
    Button

RED HILL LUTHERAN CHURCH

TUSTIN, CA

  • Construction of a 24,000 square foot, three-story Christian Life Center that includes a basement level and two floors above grade.
  • Roof was built up at flat areas and Spanish tiles occupy the pitched areas.
  • Work also included interior finishes and the installation of an elevator.
  • Building houses classrooms, restrooms, a kitchen, multi-purpose room with folding partitions, and a library.

PROJECT DETAIL

Contact us today at (949) 498-7500 and tell us your ideas.

Share by: